Uses the ECS 950 control unit, which features an integrated service indicator and cycle counter. Step-by-Step Installation Overview
The installation of the CDM9 operator involves precise mechanical alignment and height requirements to ensure safety and longevity. Mounting Height: The operator must be installed at a height of at least above the floor. Mechanical Assembly: Fit the first onto the pivot. on the pivot and push on the drive unit. Secure with the second stop ring and mount the torque bar rubber damper crawford cdm9 950 installation manual top
Hold the Up or Down buttons to move the door and calibrate travel limits. Uses the ECS 950 control unit, which features
Disengage the door from the drive mechanism and manually position it approximately 1.5 meters above the floor before re-engaging the unit. 2. Mechanical Positioning Mechanical Assembly: Fit the first onto the pivot
(Related search suggestions provided.)
"The team at FACE Consultants exceeded our expectations, not only..."
Portfolio ManagerProperty for Industry
"Report received with thanks. Another top quality service by FACE..."
Senior Site ManagerWates Group Ltd
"Excellent work as always Duane."
John Phoenix, Senior Contracts..."
Senior Contracts ManagerABS Brymar Floors Ltd