Glaze firing (example)

| Interval | Task | |----------|------| | Daily | Clean firing tray and chamber base with a soft brush. | | Weekly | Check vacuum pump oil level (if oil pump is used). | | Monthly | Inspect thermocouple for cracks. | | Yearly | Factory calibration recommended. |

To verify accuracy, technicians often use a "silver test." This involves placing silver rods in the furnace and running a specific test program (often program P99).

Ivoclar Programat P100 Manual English Jun 2026

Glaze firing (example)

| Interval | Task | |----------|------| | Daily | Clean firing tray and chamber base with a soft brush. | | Weekly | Check vacuum pump oil level (if oil pump is used). | | Monthly | Inspect thermocouple for cracks. | | Yearly | Factory calibration recommended. |

To verify accuracy, technicians often use a "silver test." This involves placing silver rods in the furnace and running a specific test program (often program P99).

Cedido por: Paulo de Deus

Data: 06-08-2019  | Tamanho: 671.00 MB

Cedido por: Paulo de Deus

Data: 06-08-2019  | Tamanho: 997.00 MB