Ramesh Gulati
Minimizing unscheduled downtime through disciplined planning. and with it
One day, Ramesh was approached by the leadership team of a large manufacturing plant, struggling with frequent equipment breakdowns and high maintenance costs. The plant's reliability was suffering, and with it, their ability to meet customer demand. and with it
The book is structured to answer the "what, why, and how" of operational excellence: and with it
Ramesh knew that to turn things around, he had to help the team adopt a proactive and preventive approach to maintenance. He began by introducing the concept of Reliability-Centered Maintenance (RCM), a methodology that focuses on identifying and addressing the root causes of equipment failures.